One auto stopped because of some problem on overbridge and with in 10 mins traffic was jammed from Gandhi circle to RTC busstand. if this is the situation then think about an year or two later.
No one planned for future. but that lack of planning is now showing its ugly face.
Roads immediately possible for expansion:
1. MSR to Nutrine
2. Kattamanchi to Murakambattu
3. RTC busstand to FCI
These roads can be taken up immediately and need Lesser land acquisitions and demolitions.
High road and Santhapet road needs lot of demolitions and will have to face lot of court cases. So this might be delayed temporarily.
Widening and strengthening the Bye pass roads and Masonics to Greamspet will ease some traffic.
Puttur road widening works are going on in full swing as shown in picture. But this 4 lane. road is from FCI to Thana only. What about the traffic entering the city.
Another great example of mindless ignorance and lack of planning is sanctoning of 5 crores for Kattamanchi bridge on neeva river. 5 Crores will only be sufficient for 2 lane bridge which will not relieve the traffic problem on important road.
Lets stop with this temporary solutions and think and plan for future of Chittoor.