All those interested in railway developments in chittoor are familiar with the delay in installing Coach Indication Boards in Chittoor station. These works were supposed to be finished in 2009 itself.So I wrote to railways reg this on 18 july. Here is the reply
Message : Sir, although the tender for led based coach indication boards has been discharged for CHITTOOR station, the work has not yet started.kindly rectify the delay Registration Id : '1007180026' Time stamp : 2010-07-18 12:06:45.0
S.No ActionTaken 1 Due to modification in RDSO spec, the est are recasted and are under vetting. The tenders will be refloated and work will be taken on priority. Then to follow this up I wrote back to railways on 28 sep. Surprised this time the replychanged putting the blame on contractor
Message : Sir, Tenders for LED Coach
indication boards are being called for
even smaller stations like markapur, but
CTO station
still lacks them even after sanction in
2009 Registration Id : '1009280017'
Time stamp : 2010-09-28 14:00:26.0
S.No ActionTaken 1 Tenders have been called
and finalized for CTO earlier. Due to
non performance of contractor the
contract was terminated.
Now again tenders are called and
opening is on 8th NOV. I have checked the tender form which is to be opened on November 8. These are thehighlights of this tender.1. 24 double sided led coach indication boards for each 1st and 2 nd platforms2. One single sided coach guidance board at entrance of 1 st platform3. Two double sided coach guidance board for each 1 st and 2 nd platform4. One 40 inch LCD monitor at station concourse to display train information5. One at a glance board for the stationHope this time the contractor is good and finishes in time.
--
Posted By hi chittoor to Mana Chittoor at 10/02/2010 11:21:00 AM